Independent planning guidance for Durham Region Not a municipal service
Planning & property journal

Protected Left Turns Planned for Taunton–Harmony and Highway 2–Courtice

Published on DurhamPlanning October 15, 2026 · Independent information

Source date: October 14, 2026. Last reviewed: October 15, 2026.

Durham Region plans to install fully protected left-turn signals at two intersections at the end of October 2026: Taunton Road East and Harmony Road North in Oshawa, and Durham Regional Highway 2 and Courtice Road in Clarington. The October 14 notice identifies the eastbound and westbound left-turn lanes at both locations.

This is an announced change to intersection operation, not confirmation that the new signals are already active. The Region gives an end-of-October installation window but no exact activation day. People arranging site visits, deliveries or regular trips through either junction should check the current notice and follow the signals actually displayed.

Which movements are changing?

The stated movements are left turns from Taunton Road East onto Harmony Road North, and from Regional Highway 2 onto Courtice Road. The announcement is not a blanket change to every approach or every traffic signal at those intersections. Its eastbound and westbound wording matters when comparing the notice with a particular journey.

A protected left turn has a dedicated green arrow while opposing traffic is stopped. The Region says the new indications are intended to ensure drivers make these left turns only when the green left-turn arrow is visible. The announcement links the change to Durham Vision Zero and reducing conflicts between turning and oncoming vehicles.

What this means for access planning

For a business, property owner or contractor near either corridor, the relevant change is how an existing intersection manages turning traffic. Our roads, access and development guide explains why the public road network is an important part of property due diligence. A delivery route may use one of these junctions even when the destination has an entrance on another street.

The notice does not announce a new driveway, road widening, development approval or additional water and sewer capacity. It also gives no construction-related lane-closure schedule. Avoid reading those details into a traffic-signal announcement. If a project depends on access changes, use the planning-responsibilities guide to distinguish the road authority’s role from local land-use decisions.

Keep the timing and approval questions separate

The late-October window is useful for scheduling, but it is not a promise of a particular commissioning date. Before a time-sensitive trip, consult the Region’s notice below for any revision. For a property transaction or proposed development, record the intersection and intended access movement in your planning checklist, then use our planning contacts guide to find the appropriate authority for property-specific questions.

The practical takeaway is narrow: two existing intersections have a planned change to eastbound and westbound left-turn control. The announcement explains the safety purpose and approximate timing; it does not establish new development rights for surrounding land.

Sources and verification

Verified October 15, 2026. All About Durham was used for secondary discovery; facts were checked against the first-party notice. Featured image: original DurhamPlanning factual schematic, not a map or engineering drawing.

DurhamPlanning.com is an independent information site, not an official government website. Information can change and is not a guarantee of approval or current requirements. Confirm property-specific questions with the relevant municipality, Durham Region and conservation authority where responsibilities overlap.

Scroll to Top